PLINTHRequest a demo

01ProductResidential site assessment

Site risk, servicing cost and resilience metrics.

For a specified home and community program: how much can this site hold, how should it be serviced, what will that cost, how long could delivery take, and what could change the decision?

Request a demo
Self-reliant designRSA-01 / SP-01

01

Design summary

Current

Site inputs

  • Soil percolation12 min/in
  • Depth to water table2.4 m
  • Well depth, nearby98 m
  • Well yield45 gpm
  • Solar resource1,480 kWh/kWp
  • Ground conductivity2.1 W/m·K
  • Bedrock depth3.1 m
  • Frost depth1.2 m

On-site systems, per homeLikely

  • Solar PV9.6 kW roof and ground mount$27k
  • Battery storage13.5 kWh$14k
  • Geothermal heat pump3 ton, two 90 m boreholes$27k
  • SepticMound system, 3 bedrooms$22k
  • WellDrilled to 98 m, shared by 4 homes$6k
  • Water storage9,500 L tank$4k

Total, low / likely / high$82k / $100k / $123k

Evidence resolved38 / 44

Sample parcel / Illustrative values

02PhasesPL-01 – PL-03

Three phases, one record.

PLINTH walks you through what you can do with your land, then makes the path from that answer to deployed units seamless.

PL-01 / 01·03

assess

What the land and the law allow.

09 services

PL-01 / Services

  1. 01Soil classification
  2. 02Percolation testing
  3. 03Sunlight and solar access
  4. 04Energy access and grid capacity
  5. 05Flood and wetland screening
  6. 06Water supply and wells
  7. 07Zoning, use and yield
  8. 08Access and frontage
  9. 09Environmental records

PL-02 / 02·03

design

Layout, servicing and cost, compared.

09 services

PL-02 / Services

  1. 01Site layout and yield
  2. 02Unit selection and specification
  3. 03Servicing scenarios
  4. 04Solar and storage sizing
  5. 05Water and wastewater design
  6. 06Stormwater and grading
  7. 07Cost ranges
  8. 08Outage resilience test
  9. 09Permit drawing set

PL-03 / 03·03

deploy

Factory-built units, set and running.

09 services

PL-03 / Services

  1. 01Factory manufacturing
  2. 02Foundations and screw piles
  3. 03Logistics and delivery
  4. 04Craning and setting
  5. 05Utility connections
  6. 06Solar and battery commissioning
  7. 07Inspections and sign-off
  8. 08Handover documentation
  9. 09Performance monitoring

Open a sheet to see the services in that phase

03ServicingEnergy independence

Connected, self-reliant or hybrid. Compared at the same output.

Every compatible combination of power, water, wastewater, communications and access is evaluated at the same home count, phase and service level. Costs print as low, likely and high, compared only on the lines that differ, with the breakeven stated when an unknown could reverse the result.

Off-grid has an exact meaning. Electricity, water and wastewater are assessed separately, fuel deliveries and hauling are declared, and a full off-grid finding needs the complete load met in every modelled interval and stress case.

Connected

Power
Grid
Water
Public main
Wastewater
Sewer

Self-reliant

Power
Solar and storage
Water
Well
Wastewater
On-site

Hybrid

Power
Grid, solar, storage
Water
Public main
Wastewater
On-site

04Contactbusiness@plinth-labs.com

See a report on a parcel you know

A / Demo

A walkthrough on your own site

Bring a site and a development program. We run the screen, the servicing comparison and the unit match, and walk you through the result.

Request a demo

B / Contact

Sites, markets and units

For anything else, write to us directly.

business@plinth-labs.com